资讯详情
新航道 雅思写作 资讯详情

机考真题小作文示范写作 | 地图 澳洲两个隧道对比

2026-11-20 11:30:16

浏览:

来源:新航道官网

分享雅思考试小作文真题范文。每一篇范文是经由专业团队反复校对,最终外教审查定稿。成功就是日复一日那一点点小小努力的积累。

The diagrams below show a comparison between two road tunnels in two Australian cities.

 

 

主体段分段方法:

主体1:建造时间、长度、宽度

主体2:内部结构、外部建筑

 

 

开头段

 

The diagrams present a comparison of the layouts and technical specifications of two road tunnels in Australia.

 

概述段

 

Overall, while both tunnels employ a twin-tube design, Tunnel B is larger in both depth and capacity, despite its shorter construction timeline. This larger scale comes with a substantially higher financial cost in Tunnel B.

 

思路要点:

 

- 两个隧道都有twin-tube design

- 隧道B更深、面积更大,建造成本更高

 

Body paragraph 1

 

Tunnel A was constructed between 1997 and 2002, at a cost of $555 million. It extends for 2.2 kilometers and reaches a maximum depth of 15 meters beneath the sand layer. Tunnel B, by contrast, was constructed much later (from 2002 to 2006) with a total investment of $1.1 billion. It is 3.6 kilometers in length, with a maximum depth of 25 meters.

 

思路要点:建造时间、长度、宽度

 

- Tunnel A:1997-2002年间建造,花费$555 million;长2.2千米、深15米

- Tunnel B:建造时间更晚(2002年-2006年),花费$1.1 billion;长3.6米、深25米

 

Body paragraph 2

 

Although both tunnels feature a twin-tube design, Tunnel B's larger dimensions allow it to accommodate greater traffic volumes, providing three lanes per tube rather than the two-lane configuration of Tunnel A. This difference makes Tunnel B significantly more efficient than Tunnel A. Regarding the surface features above the tunnels, Tunnel A passes beneath a river, with the towers of a suspension bridge visible above, whereas Tunnel B runs underneath a busy highway lined with multi-storey buildings.

 

思路要点:内部结构、外部建筑

 

- 共同特点:两个隧道都是双管结构

- 隧道B 尺寸更大,可承载更大车流量,每管 3 车道;A 每管 2 车道

- A 在河流下方,上方可见悬索桥(suspension bridge)桥塔

- B 在繁忙公路下方,公路两侧是多层建筑

 

新航道全国报名咨询热线:400-011-8885。如需了解雅思、托福、SAT、A-Level、GRE、多邻国等语言培训课程,或咨询出国留学规划、院校申请、试听课预约等服务,欢迎致电咨询。专业顾问将为您提供一对一答疑。

备考工具

热门活动